The lightship/restaurant at Le Phare Bleu

Inside of the lightship

Artist rendering of the finished resort. Currently all buildings are under construction.

One of the pan bands warming up before show

Notice the wheeled frames the pans are mounted on

A poor shot of the stage during Parorama

Spider webbing in two slips for storm prep

The Kemah, TX contingent

Far enough off the dock to not rub but still can jump off and on.

This is what the whole bottom looked like before pressure washing.

After pressure wash large chunks of paint flaked off

Lots of paint peeled off the keel with presure wash

Looks kinda like a whale with a smile and eyes on the side of it's head

After day one sanding

Most of keel sanded to bare lead

Gelcoat repair started

End of day two. Primered.

Propeller cleaned

Our temporary tent while enclosure is off.

End of day four. Looked like this at end of day three too.

Gelcoat repair done

Other gelcoat repair done

New zincs on shaft

Our view from the yard.

Lots of boats stored for hurricane season

Sunset in the yard.

On the way to launch

About to go in the water. Note, it's pouring rain.