|
|
The lightship/restaurant at Le Phare Bleu
|
|
|
Inside of the lightship
|
|
|
Artist rendering of the finished resort. Currently all buildings are under construction.
|
|
|
One of the pan bands warming up before show
|
|
|
Notice the wheeled frames the pans are mounted on
|
|
|
|
A poor shot of the stage during Parorama
|
|
|
Spider webbing in two slips for storm prep
|
|
|
The Kemah, TX contingent
|
|
|
Far enough off the dock to not rub but still can jump off and on.
|
|
|
This is what the whole bottom looked like before pressure washing.
|
|
|
|
After pressure wash large chunks of paint flaked off
|
|
|
Lots of paint peeled off the keel with presure wash
|
|
|
Looks kinda like a whale with a smile and eyes on the side of it's head
|
|
|
After day one sanding
|
|
|
Most of keel sanded to bare lead
|
|
|
|
Gelcoat repair started
|
|
|
End of day two. Primered.
|
|
|
Propeller cleaned
|
|
|
Our temporary tent while enclosure is off.
|
|
|
End of day four. Looked like this at end of day three too.
|
|
|
|
Gelcoat repair done
|
|
|
Other gelcoat repair done
|
|
|
New zincs on shaft
|
|
|
Our view from the yard.
|
|
|
Lots of boats stored for hurricane season
|
|
|
|
Sunset in the yard.
|
|
|
On the way to launch
|
|
|
About to go in the water. Note, it's pouring rain.
|
|
|